品牌:
型号:
描述: From July 2023 to January 2024, completed the ground installation and commissioning of navigation equipment at Boten Airport in Laos, ground flight calibration, and on-site training turnkey project.
Navigation equipment engineering project at Bo glue Airport, Laos
From July 2023 to January 2024, completed the on-site installation and commissioning of the Instrument Landing System NM7000B, Glide Path Distance Measuring Equipment LDB-103, and the VOR/DVOR53D/LDB-103 equipment at Laos Bo glue Airport, as well as ground flight calibration and on-site training projects.